FOR WEEK FEBRUARY 13, 2022
Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.
As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.
If you know before you go, you can plan accordingly and save time and money.
MANATEE COUNTY
I-75 at US 301 Interchange (Exit 224): Construction project: Project will widen I-75 from SR 64 to the Manatee River, reconfigure the I-75/US 301 interchange from a partial cloverleaf interchange to a tight diamond configuration, construct new bridges over the Manatee River for a northbound exit ramp and a southbound entrance ramp, and US 301 improvements. This week crews will work on milling and resurfacing I-75 northbound.
Variable message signs will be in place to alert drivers that work is underway. Estimated completion is early 2025.
I-75 Southbound at the Manatee River Bridge: Bridge maintenance: Crews will be performing overnight maintenance Monday, February 14, and Tuesday, February 15, from 9 p.m. to 5 a.m. Motorists should expect southbound right lane closures.
I-75 at SR 70 Interchange (Exit 217): Construction project: This week, crews will work on the ramps, and median and work on SR 70.
Variable message signs will be in place to alert drivers that work is underway. Estimated completion is spring 2022.
I-75 at SR 64: Landscape installation: Crews are installing landscaping that may require periodic shoulder closures. No roadway lane closures are anticipated. Estimated completion is winter 2022.
US 41 / 14th Street from 63rd Avenue to Bay Drive: Maintenance construction: On Wednesday, February 14, crews will be making overnight pothole repairs from 7:30 p.m. to 5:30 a.m.
US 41 at 1st Street from Manatee Memorial Hospital to 13th Avenue: Maintenance construction: Starting February 21 through February 22, crews will be making overnight pothole repairs from 7:30 p.m. to 5:30 a.m.
US 41 / US 301 DeSoto Bridge: Construction project: Crews have begun the DeSoto Bridge improvement project on US 41/ US 301 and the Hernando DeSoto Bridge. Lane closures will be predominantly limited to overnight hours from 11 p.m. to 5:30 a.m. so inconvenience to motorists should be limited. During Phase 5 and 6, pedestrian detours will be in place by the River Walk Skate Park. Marine traffic should be unaffected. Expect noise from construction equipment, backup alarms, and overnight lighting. Completion is anticipated summer 2022.
SR 64 from 22nd Street East to 27th Street East: Maintenance construction: Starting February 23 through February 24, crews will be making overnight pothole repairs from 7:30 p.m. to 5:30 a.m.
SR 64 at School House Drive: Construction project: Crews are installing drainage improvements. This week, crews will be working on installing pavement markings. Motorists are advised to expect one lane closed on SR 64 during construction. Expected completion is early February 2022.
SR 684 Cortez Road from US 41/ 14th Street to 26th Street: Construction project: Crews are completing a median modification project to control motorist speed and safety through the corridor, provide enhanced lighting, and improve pedestrian and bicycle safety. The posted speed limit will be maintained as will pedestrian access to bus stops and side streets. Expected completion is winter 2022.
SARASOTA COUNTY
I-75 at SR 72/Clark Road (Exit 205): Construction project: Project improvements include reconstructing the existing interchange to a Diverging Diamond Interchange (DDI), adding auxiliary lane on I-75 northbound from SR 72 to Bee Ridge Road, widen I-75 southbound from Proctor Road to SR 72, and improvements on Clark Road. This week, crews will work on widening I-75, noise walls and drainage work.
Variable message signs will be in place to alert drivers that work is underway. Estimated completion is late 2023.
I-75 northbound over Main A Canal (0.5 miles north of Bee Ridge Road): Bridge maintenance: Crews will be making overnight repairs Sunday, February 13, from 9 p.m. to 5 a.m. North bound motorists can expect intermittent lane closures.
US 41 from Beneva Road to Caribbean Drive: Construction project: Construction on US 41 from Beneva Road to Caribbean Drive is underway, adding sidewalks, widening paved shoulders, and adding turn lanes to accommodate six-foot wide bicycle lanes along the 1.37 mile stretch of road. Modifications to existing traffic signals and crosswalks will accommodate the bicycle lanes and new sidewalks. To reduce the number of vehicle conflict points and enhance roadway safety in the high-traffic area, median openings along the corridor will be modified eliminating select turns across traffic. Lane closures are expected in the project boundaries so please use caution in the area or consider alternate routes if needed. Completion is expected by end of 2022.
US 41 at the KMI Bridge across Hatchett Creek, Venice: Bridge construction: Crews have begun the bridge improvement project that will go through spring 2022. Lane closures will be limited predominantly to overnight hours from 8 p.m. to 6 a.m.
US 41 at Gulfstream Avenue Roundabout Project, Sarasota: Construction project: Crews will work within the right-of-way, medians, driveways and throughout the project limits. Please use caution and watch for construction vehicles, dump trucks, semi-trucks and heavy equipment entering or exiting the work zone.
Phase 1A configuration in place (island traffic only on US 41 south of Fruitville Road and north of Main Street). Watch for new traffic patterns, traffic signals, and pavement markings. Motorists are urged to use alternate detour route, if possible.
Activities Include:
Detours/Crossings:
Construction activities will take place during the daytime and occasionally during nighttime hours.
Expect noise from grinding asphalt, hammer drills, noise and vibration from construction equipment, backup alarms, vacuum trucks, pumps, and lighting.
Detours and lane closures will be in place during various phases of the project. During construction, the speed limit will be reduced to 25 mph on US 41 and Gulfstream Avenue.
Improvements being made as part of this project consist of replacing the existing signalized intersection on US 41 at Gulfstream Avenue with a roundabout, installation of HAWK pedestrian crossing signal system, raised pedestrian refuge islands, replacement of underground drainage structures, utilities, fiber optic, new LED streetlights, reconfiguration of stormwater retention ponds, sidewalks, and pedestrian walkways. Expected completion is fall 2022.
US 41 Tamiami Trail over Phillipi Creek: Bridge maintenance: Crews will be making overnight repairs Thursday, February 17, from 8 p.m. to 4 a.m. Motorists can expect intermittent lane closures both north and southbound.
US 41 / Between University Boulevard and Myrtle Street: Maintenance construction: Starting February 16 through February 17, crews will be making overnight pothole repairs from 7:30 p.m. to 5:30 a.m.
US 41 between the Red Barn and University Parkway: Maintenance construction: Starting February 14 through February 25, crews will be replacing pavement markings (both long line and markings at intersections) overnight from 9:30 p.m. to 5:30 a.m.
SR 789 on New Pass Bridge: Bridge maintenance: On Monday, February 14, crews will be performing maintenance from 9 a.m. to 4 p.m. Motorists should expect a lane shift so use caution in the area.
SR 780 Fruitville Road at Lime Avenue: Permit project: Crews will be making watermain, sidewalk and roadway repairs through the end of February. Motorists can expect lane closures and a brief detour in the eastbound outside lane on Fruitville Road at Lime Avenue and in the westbound left turn lane onto southbound Lime Avenue. Please use caution in the area.
SR 777 River Road from US 41 to I-75: Construction project: Construction recently started February 7, 2022, and motorists will see tree removal and clearing activities along the outside of the existing roadway starting near I-75 moving south. Existing traffic patterns will not be affected. Completion is expected in winter 2024.
SR 758 Bee Ridge Road from US 41 to Macintosh Road: Construction project: Crews will be replacing lighting luminaire structures along the corridor during overnight hours through February 2022. Please use caution and anticipate lane closures.
SR 72 and Lockwood Ridge Road: Permit construction project: A temporary road closure will be in place through the end of February. Sarasota County will be constructing a sewer lift station north of Clark Road. The left turn lane from eastbound SR 72 onto north Lockwood Ridge Road will be closed. Alternately, the westbound SR 72 outside thru-lane will not allow a right turn onto Lockwood Ridge Road. Please follow the posted detour and use caution in the area.
SR 72 Clark Road and Lorraine Road Roundabout: Permit construction project: Roundabout construction is underway so please use caution in the area. Motorists can expect intermittent lane closures. Expected completion is June 2022.
SR 72 Stickney Point at US 41: Permit project: Crews will be constructing drainage structures and installing a signal through February 2022. Please use caution and watch for workers in the construction zone.
SR 72 Clark Road at Proctor Road and Dove Avenue Roundabout: Construction project: Crews have begun construction of the new free-flowing roundabout replacing the current signalized intersection. Motorists can expect short duration flagging operations for material delivery. Please use caution in the work zone and be aware of bicyclists sharing the roadway. Completion is expected in fall 2022.
By accepting you will be accessing a service provided by a third-party external to https://www.mympo.org/