traffic-watch

FOR WEEK OF NOVEMBER 18, 2018

Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones.
Remember, speeding fines are doubled in work zones.

As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to
learn about traffic conditions on major roadways across the state.
If you know before you go, you can plan accordingly and save time and money.

 

MANATEE COUNTY

I-275 at the Sunshine Skyway Rest Areas in Manatee and Pinellas Counties: Construction project: Improvements include constructing new rest areas and new parking lots with LED lighting, seawall repairs and extending the seawall at the Manatee County rest area to accommodate a new picnic pavilion. The Pinellas County Skyway Rest Area is closed for renovations. During this time, motorists will be directed to the Manatee County Skyway Rest Area. The closure is expected to last until fall 2018. The fishing piers will remain open during the closure. Construction is on-going on the new rest area site and the seawall on the Manatee side, west of I-275.  Expected completion of both rest areas is fall 2019. David Nelson Construction Company is the contractor. 

I-275 Southbound Ramp to I-75 Northbound (Exit 228): Construction project: Crews are replacing the concrete bridge deck on the southbound I-275 ramp to northbound I-75.  The I-275 southbound ramp to northbound I-75 is closed for approximately ten (10) months. Traffic is being detoured north on US 41/S Tamiami Trail to SR 674/E College Avenue in Hillsborough County. A temporary traffic signal has been installed on US 41 at the southbound I-275 exit. Periodic nighttime/overnight I-75 northbound/southbound and I-275 southbound lane closures beneath I-275 will occur during construction. There will be nighttime/overnight northbound and southbound lane closures on I-75 the week of Sunday, November 18, excluding the Thanksgiving holiday from Wednesday, November 21 through Sunday, November 25. Lane closures will resume Monday, November 26. The I-75 northbound ramp to I-275 northbound will be closed at night the week of Monday, November 26. Nighttime/overnight detour will be in place during these times. Drivers will be detoured to Moccasin Wallow Road to US 41. From US 41, drivers will be able to merge onto I-275 north. Use caution and watch for changes in the traffic pattern. Expected completion is summer 2019. Cone & Graham, Inc. is the contractor.

I-75 at SR 70 Interchange (Exit 217): Construction project: This week, crews will install erosion control devices, clearing vegetation, setting up Maintenance of Traffic, and resurfacing I-75 northbound between SR 70 and SR 64.  Travel lanes on I-75 will shift during paving operations.  In observance of the Thanksgiving holiday, crews will not be working and/or performing any lane closures from Wednesday, November 21st through Sunday, November 25th.

Variable message signs will be in place to alert drivers that work is underway. Estimated completion is late 2021. The contractor is Sacyr Construction USA, LLC.

I-75 at SR 64 (Manatee Avenue) Interchange (Exit 220): Construction project: This week, crews are currently widening northbound and southbound I-75 and performing ramp, grading, utility, and drainage work, and SR 64 westbound reconstruction.  In observance of the Thanksgiving holiday, crews will not be working and/or performing any lane closures from Wednesday, November 21st through Sunday, November 28th.

This project reconstructs the interchange, widens interchange ramps and SR 64, and installs sidewalks and bicycle lanes on SR 64. Variable message signs will be in place to alert drivers that work is underway. Drivers should use caution while traveling in this area. Estimated completion is late 2019. The contractor is Prince Contracting LLC.

I-75 at the University Parkway Interchange (Exit 213): Construction project: Crews are installing landscaping and irrigation systems at the I-75 and University Parkway interchange. Lane closures on I-75, if needed, will occur between 8 p.m. and 5 a.m. Lane closures on University Parkway, if needed, will occur between 9 p.m. and 6 a.m. Estimated completion is spring 2019. The contractor is Frankie Valdez Company, Inc.

US 301 from CR 675 to Moccasin Wallow Road: Construction project: Crews are installing new landscaping, irrigation and welcome signs. Superior Landscaping & Lawn Services is the contractor. Expected completion is fall 2018.

US 301 at Ellenton Gillette Road: Maintenance permit project: Crews are constructing a turn-lane. Expect daytime lane closures from 9 a.m. to 3:30 p.m. through Friday, November 30. Use caution and expect possible delays.

Business US 41 (9th Street W) at the Green Bridge; at 3rd Avenue W, and from 3rd Avenue W to SR 64 (Manatee Avenue): Construction project: Crews are constructing a multi-use path; constructing sidewalk; improving drainage; constructing turn lanes, and installing new signing and pavement markings. Expect nighttime/overnight lane closures on Business US 41 (9th Street W) from 8 p.m. to 6 a.m. while crews are working. The outside southbound lane on Business US 41 over the Green Bridge is closed to traffic while the contractor is working on the concrete barrier wall. For safety purposes, the lane will remain closed 24/7. Please plan additional travel time. Estimated completion is spring 2019. The contractor is Gosalia Concrete Constructors, Inc.

US 41 between 37th Avenue W and 36th Avenue W: Maintenance permit project: Crews are constructing a driveway. Expect intermittent northbound lane closures from 9 a.m. to 4 p.m. through Friday, November 30. Use caution and expect possible delays.

US 41 at 57th Avenue W: Maintenance permit project: Crews are constructing a driveway. Expect daytime lane closures from 9 a.m. to 3:30 p.m. through Friday, November 30. Use caution and expect possible delays.

SR 789/Gulf Drive from SR 64 (Manatee Avenue) to SR 684 (Cortez Road): Maintenance permit project: Manatee County is installing new force mains and water mains. For additional information about the project, please visit the project website at www.amipipereplacement.com. 

SR 70 (15th Street E) at 9th Avenue E: Construction project: Crews are constructing a roundabout; installing highway lighting and landscaping; improving drainage; constructing sidewalk, and resurfacing the roadway. The intersection of SR 70 (15th Street E) and 9th Avenue E is closed to traffic for approximately six (6) months. Please use 13th Avenue E and 7th Avenue E as alternate routes during this time. A temporary traffic signal will be installed at the intersection of SR 70 (15th Street E) and 13th Avenue E while the detour is in effect. Watson Civil Construction, Inc., is the contractor. Expected completion is spring 2019.

SR 64 at Rye Road: Construction project: Crews are constructing a multi-lane roundabout; resurfacing the roadway; improving drainage, and installing new highway lighting and landscaping. State Road 64 will be reduced to one lane in each direction through early December, excluding the Thanksgiving holiday from Wednesday, November 21 through Sunday, November 25. The speed limit will be reduced to 45 mph within the construction zone. IBT Construction is the contractor. Expected completion is late 2019.

 

SARASOTA COUNTY

Laurel Road at the Legacy Trail Crossing: Construction project: Crews are constructing a pedestrian bridge along the Legacy Trail over Laurel Road. Please be aware of construction vehicles entering and leaving the construction zone. Both northbound and southbound trail traffic is now being detoured to the east along the signed detour route utilizing the Mission Valley Boulevard signal to cross Laurel Road. Please follow detour signs provided. Intermittent single lane closures at the bridge are possible from 9 a.m. to 3 p.m. weekdays only. Denson Construction, Inc. is the contractor for the bridge. Expected completion is late 2018.

I-75 at the University Parkway Interchange (Exit 213): Construction project: Crews are installing landscaping and irrigation systems at the I-75 and University Parkway interchange. Lane closures on I-75, if needed, will occur between 8 p.m. and 5 a.m. Lane closures on University Parkway, if needed, will occur between 9 p.m. and 6 a.m. Estimated completion is spring 2019. The contractor is Frankie Valdez Company, Inc.

I-75 over Bee Ridge Road (2.7 miles south of Fruitville Road): Bridge maintenance project: Crews are working on the bridge. Expect nighttime/overnight intermittent outside, center and inside north and southbound lane closures from 9 p.m. to 5 a.m. Thursday, November 29. Double lane closures will begin at 11 p.m., when needed. Use caution and expect possible delays.

US 41 from SR 789 to Ritz Carlton Drive and sidewalk located along the north side of SR 789 from Sunset Drive to US 41: Maintenance permit project: The sidewalk will remain closed until construction of the development located at the corner of US 41 and SR 789 is complete. Pedestrians should follow the established detour.

US 41 from Salford Boulevard to Sumter Boulevard: Construction project: Crews are widening US 41 from Salford Boulevard to Sumter Boulevard to a six-lane highway; resurfacing the roadway; improving drainage; constructing sidewalk, and installing highway lighting. Expect nighttime/overnight lane closures from 8:30 p.m. to 5:30 a.m. when crews are resurfacing the roadway. Expect periodic driveway closures along the northbound lanes while crews are installing drainage systems. Russell Engineering, Inc. is the contractor. Expected completion is spring 2019.

US 41 Roundabouts at 10th Street and 14th Street, Sarasota:  Construction project: Crews continue work within the right-of-way, medians and driveways.

Speed limit is reduced to 30 mph. Speeding fines are doubled in the construction area when workers are present.

Improvements being made as part of this project consist of reconstructing the signalized intersections and replacing them with roundabouts, enhancing connectivity, circulation and safety. US 41 will be widened between the two intersections and will include bike lanes as well as dedicated turn lanes, a 10-foot sidewalk along the west side, and a 6-foot sidewalk along the east side. Other improvements include raised islands for pedestrian refuge at the intersections of US 41 at 10th Street and 14th Street, pedestrian signals, LED street lights, landscaping, and City of Sarasota utility and underground drainage structure replacements. Expected completion is spring 2020. The contractor is IBT Construction LLC.

US 41 from Hospital Road to River Road: Maintenance permit project: Crews are constructing new turn-lanes, driveway connections, and working in the medians. Expect intermittent north and southbound daytime lane closures from 9 a.m. to 4:30 p.m. through Friday, November 30. Use caution and expect possible delays.

US 41 from McIntosh Road to Beneva Road: Construction project: Crews are constructing sidewalk and bicycle lanes, improving drainage, reconstructing the US 41 southbound bridge over Catfish Creek south of Central Sarasota Parkway, installing highway lighting, upgrading signals, and installing new signing and pavement markings.

Motorists should use caution and obey the posted speed limit. Expected completion is fall 2019. The contractor is Morrison-Cobalt JV.

US 41 from Tuscola Boulevard to Ortiz Boulevard: Construction project: Crews are constructing a multi-use path; installing bus pads and shelters; improving drainage; constructing/replacing sidewalk; installing guardrail and highway lighting, and installing new signing and pavement markings. Expect nighttime/overnight lane closures from 7 p.m. to 6 a.m. Daytime lane closures between 9 a.m. and 2 p.m. are possible. Lane closures within 600 feet of signalized intersections are not permitted between 5:30 a.m. and 7 p.m. Florida Safety Contractors, Inc. is the contractor. Expected completion is spring 2019. 

US 41 from Stickney Point Drive to Couver Drive: Maintenance permit project: Crews are constructing a driveway. Expect northbound outside lane closures from 9 a.m. to 4:30 p.m. through Friday, November 30. Use caution and expect possible delays.

 

www.mympo.org | @saramanampo | This email address is being protected from spambots. You need JavaScript enabled to view it.